The critical path of a network is the


A) path with the least variance.
B) path with zero slack.
C) path with the most activities.
D) path with the largest variance.
E) None of the above

F) B) and E)
G) A) and E)

Correct Answer

verifed

verified

The work breakdown structure involves identifying the ________ for each activity.


A) time
B) cost
C) resource requirements
D) predecessors
E) All of the above

F) C) and E)
G) A) and B)

Correct Answer

verifed

verified

Consider the tasks,durations,and predecessor relationships in the following network.Draw the network and answer the questions that follow. Consider the tasks,durations,and predecessor relationships in the following network.Draw the network and answer the questions that follow.   (a)What is the expected duration of the project? (b)What is the probability of completion of the project before week 42? (a)What is the expected duration of the project? (b)What is the probability of completion of the project before week 42?

Correct Answer

verifed

verified

The project described by: The project described by:   has a critical path of length of A) 21 days. B) 14 days. C) 23 days. D) 32 days. E) None of the above has a critical path of length of


A) 21 days.
B) 14 days.
C) 23 days.
D) 32 days.
E) None of the above

F) A) and D)
G) A) and C)

Correct Answer

verifed

verified

Figure 11-1 Figure 11-1   -Given the network shown in Figure 11-1,assume that completion of A is delayed by two days.What other activities are impacted? A) B B) D C) E D) C E) None of the above -Given the network shown in Figure 11-1,assume that completion of A is delayed by two days.What other activities are impacted?


A) B
B) D
C) E
D) C
E) None of the above

F) All of the above
G) A) and C)

Correct Answer

verifed

verified

CPM is a probabilistic analysis of managing a project.

A) True
B) False

Correct Answer

verifed

verified

PERT


A) assumes that we do not know ahead of time what activities must be completed.
B) assumes that activity time estimates follow the normal probability distribution.
C) is a network technique that uses three time estimates for each activity in a project.
D) is a deterministic network technique that allows for project crashing.
E) None of the above

F) C) and D)
G) B) and E)

Correct Answer

verifed

verified

Given an activity's optimistic,most likely,and pessimistic time estimates of 1,9,and 23 days respectively,compute the PERT expected activity time for this activity.


A) 10
B) 12
C) 9
D) 11
E) None of the above

F) A) and B)
G) None of the above

Correct Answer

verifed

verified

The variance of the project completion time is equal to the sum of the variances of all the activities.

A) True
B) False

Correct Answer

verifed

verified

Table 11-4 The following represents a project with known activity times.All times are in weeks. Table 11-4 The following represents a project with known activity times.All times are in weeks.   -Using the data in Table 11-4,compute the slack time for activity D. A) 0 B) 5 C) 3 D) 6 E) None of the above -Using the data in Table 11-4,compute the slack time for activity D.


A) 0
B) 5
C) 3
D) 6
E) None of the above

F) A) and B)
G) A) and C)

Correct Answer

verifed

verified

The first step in planning and scheduling a project is to develop the


A) employee scheduling plan.
B) PERT/CPM network diagram.
C) critical path.
D) work breakdown structure.
E) variance calculations for each activity.

F) A) and B)
G) None of the above

Correct Answer

verifed

verified

Using the data in Table 11-1,compute the latest finish time for activity E.


A) 4
B) 10
C) 14
D) 25
E) None of the above

F) A) and E)
G) B) and E)

Correct Answer

verifed

verified

PERT stands for


A) probabilistic evaluation and review technique.
B) program evaluation and review technique.
C) probability of expected run times.
D) program of expected run times.
E) project evaluation and review technique.

F) A) and B)
G) All of the above

Correct Answer

verifed

verified

A small software development project has four major activities.The times are estimated and provided in the table below. A small software development project has four major activities.The times are estimated and provided in the table below.   (a)What is the expected completion time for this project? (b)What variance would be used in finding probabilities of finishing by a certain time? (a)What is the expected completion time for this project? (b)What variance would be used in finding probabilities of finishing by a certain time?

Correct Answer

verifed

verified

(a)expected completi...

View Answer

Table 11-4 The following represents a project with known activity times.All times are in weeks. Table 11-4 The following represents a project with known activity times.All times are in weeks.   -Using the data in Table 11-4,compute the latest finish time for activity E. A) 4 B) 10 C) 14 D) 25 E) None of the above -Using the data in Table 11-4,compute the latest finish time for activity E.


A) 4
B) 10
C) 14
D) 25
E) None of the above

F) C) and D)
G) A) and E)

Correct Answer

verifed

verified

Your company is considering submitting a bid on a major project.You determine that the expected completion time is 150 weeks and the standard deviation is 10 weeks.It is assumed that the normal distribution applies.You wish to set the due date for the project such that there is a 95 percent chance that the project will be finished by this time.What due date should be set?


A) 108.0
B) 160.4
C) 166.5
D) 135.0
E) None of the above

F) A) and E)
G) B) and E)

Correct Answer

verifed

verified

The activity crash cost is equal to the incremental cost of shortening the project.

A) True
B) False

Correct Answer

verifed

verified

PERT was developed for a project for which activity or task times were uncertain.

A) True
B) False

Correct Answer

verifed

verified

CPM stands for Comprehensive Project Method.

A) True
B) False

Correct Answer

verifed

verified

In PERT,we assume that the project completion time can be modeled by the normal distribution.

A) True
B) False

Correct Answer

verifed

verified